Large University Uses High Temperature Hot Water Cogeneration to Reduce CO2 Emissions

Large University Uses High Temperature Hot Water Cogeneration to Reduce CO2 Emissions

A large university in Canada awarded Indeck Keystone Energy a contract for the supply of our waste heat high temperature hot water generator for use in their combined heat and power cogeneration plant in an effort to reduce CO2 emissions by 50%. The Indeck high temperature hot water generator converts the waste gas stream into 200 MMbtu /hr of hot water heat supplied to the universities’ campus heating system. Indeck’s scope of...

Read More

Coal Fired Boiler For Heating Plant

Coal Fired Boiler For Heating Plant

Indeck Keystone Energy was awarded a contract for the supply of an 80,000 PPH / 750 PSIG stoker fired coal boiler with auxiliary equipment for field erection. The system is installed at a university heating plant as part of an emissions compliance upgrade replacing boilers from the 1950’s. The boiler surpassed all performance and emission goals. The boiler and auxiliary equipment have been delivered and started up successfully.       ...

Read More