travelgateIndeck Keystone Energy was awarded a contract for the supply of two superheated 120,000 PPH / 600 PSIG Coal Fired boilers with auxiliary equipment for field erection. These systems will be installed for central heat and power at a subarctic climate location in North America . The boilers are being furnished in two phases in order to replace existing 1950's units without impeding the heating requirements of the plant. The boiler and auxiliary equipment have been delivered and started up successfully.

solid-fuelIndeck is using its time tested and proven Travagrate® stoker with reciprocating feeders and over fire air and ash re-inject system for lower emissions and increased efficiency. The stoker is completely assembled and match marked prior to disassembly to help the field to reassemble. Feeders and stoker drive unit are fabricated, assembled and tested prior to shipment. This is all done in our shop in Erie, PA.